Main Duties and Responsibilities: Responsible for supervising and participating in the plant start up on site (ASU, HYCO, NWU, and other AL process), complete the site pre-commissioning and commissioning work. Plant pre-commissioning Instrumentation: calibration and loop checks, Control System (DCS/SGS…): Hardware, configuration and logic checks Electricity commissioning, Mechanical Works:Piping, equipments cleaning and inspection. Conformity to drawings Rotating Equipment: Compressors, gas/liquid turbines, pumps testing Plant Commissioning Plant start up Process Control Tuning and Performance test, Training and Hand-over of operation to End-customer Quality control Site inspection system by system, Inspection & Test Plans follow-up Site punch-list preparation and follow up Quality Assurance and Quality Control: define and up-date the CCMP and ITP or/ Checklist, ensures compliance with its requirements; perform quality inspections; open, control and follow-up on the treatment of non conformances and/or anomalies; report on quality activities (including indicators such as NCR, FDN, etc); take corrective/preventive actions and follow-up on the treatment of non conformances and/or anomalies following quality audits; Complete the CCI progress timely and proper PID check on job site, monthly update the schedule and progress with activities properly linked and good format Reliability management to reduce startup level even (SL): impletment proper ITP / checklist and make proper forecast on the schedule management;open, control and follow-up on the treatment of SL event; 專業: 化學工程,化學機械,流程控制,制冷與低溫,動力工程,自動化等專業 需要全國出差;